Load Stability - Watch the Fraunhofer Build

Our friends at Fraunhofer have provided this great time-lapse video that documents the entire installation process of their new Load Stability - HITS system at their facility in Dortmund, Germany.

Support and engineering teams from Lansmont traveled to Germany to help with the install and bring the system to life. The entire 20 day process has been captured and condensed into about one minute of video. If you watch carefully - they seem to be enjoying the process!

 

Fraunhofer installing their horizontal impact test system.